Construction Management

Projects

Our Results

WE MANAGE OUR TECHNOLOGY IN MANY WAYS, WE CALL IT THE C+9 METHOD THAT PRODUCES THESE RESULTS:

IN THE WORKS

Current Projects

MEXICO

The most prestigious development in Baja, includes over 500 acres of luxurios single family homes, championship golf, private airport, ocean club and lodge, for members only by invitation only

COSTA PALMAS, MEXICO

Through The PIZÁ Method we observed 1,265 medium to high risks issues that we were able to eliminate prior to construction, the estimated savings are 700 thousand dlls which represent 7.5% of total project cost.

TIJUANA, MEXICO

Through The PIZÁ Method we observed 400 medium to high risks issues that we were able to eliminate prior to construction, the estimated savings are 1.1 million dlls which represent 5.8% of total project cost.

Tijuana, B.C., México

Through The PIZÁ Method we observed 950 medium to high risks issues that we were able to eliminate prior to construction, the estimated savings are 850 thousand dlls which represent 7% of total project cost.

Subscribe

Sign up for Alerts, Special Offers, Education and Updates.

© 2023 Desarrollado por Hunter Price MX

Abrir chat
1
Scan the code
Hola 👋
¿En qué podemos ayudarte?